Asphalt Plants & Hot-Mix Suppliers in Israel

Looking for an asphalt plant? All production and distribution points for asphalt mixes for paving and infrastructure work in Israel in one place, with details and locations on the map.
Asphalt standards and quality control ↓

Israel Concrete lists 23 businesses in this category, grouped by region. Each listing links to a business page with phone, address and navigation, and to the city or area page where you can compare nearby options. Before ordering, see the asphalt paving price guide.

📍 Haifa & the North
Beit She'anHaifa & the North
🟠 Asphalt
PoriaHaifa & the North
Bu'eineHaifa & the North
Beit HaShitaHaifa & the North
Ami'adHaifa & the North
Nahal Oshrat SouthHaifa & the North
VeredHaifa & the North
📍 Sharon & Gush Dan
Karnei ShomronSharon & Gush Dan
Hatzav Industrial ZoneSharon & Gush Dan
Hatzav Industrial ZoneSharon & Gush Dan
Nahal RabaSharon & Gush Dan
📍 Jerusalem & the Shfela
🟠 Asphalt
TarqumiyaJerusalem & the Shfela
Kiryat GatJerusalem & the Shfela
Beit ShemeshJerusalem & the Shfela
Kokhav HaShaharJerusalem & the Shfela
🟠 Asphalt
Beit HagaiJerusalem & the Shfela
🟠 Asphalt
Modi'imJerusalem & the Shfela
EtzionaJerusalem & the Shfela
📍 Be'er Sheva & the South
DimonaBe'er Sheva & the South
🟠 Asphalt
Har DragotBe'er Sheva & the South
Har ShaharBe'er Sheva & the South
MeitarimBe'er Sheva & the South
🟠 Asphalt
OfakimBe'er Sheva & the South
🗺️ View all asphalt plants on the map →

Asphalt is a mix of bitumen and aggregates (gravel, sand) used mainly to pave roads, pavements and parking areas. Asphalt plants mainly produce "hot" mixes that are carried in dedicated trucks and laid within a short time of leaving the plant, so distance and timing are critical when ordering. Asphalt work serves infrastructure contractors on public projects as well as homeowners who want to pave a driveway or access path. Before ordering, check: the right mix for the use (a heavy-traffic road and a private driveway need different specifications), the availability of laying and compaction equipment (roller), and the weather forecast – asphalt work is sensitive to rain. The raw materials for the asphalt mix usually come from quarries , and many infrastructure projects also combine ready-mix concrete work on the same site. Before ordering, see also the asphalt paving price guide .

🛣️ Asphalt standards and quality control

Asphalt paving mixes are produced and tested according to the standards of the Standards Institution of Israel, mainly:

  • SI 362 – hot asphalt mixes: composition, production, transport and laying.
  • SI 161 Part 1 – bitumen for asphalt roads.
  • SI 1865 Parts 2–3 – test methods for paving.
  • Process Standard 20 – process standard for producing asphalt mixes, and Process Standard 30 – for producing the quarry materials that reach the plant from quarries .

In addition, Netivei Israel (the national roads company) certifies asphalt mix producers for its works under a dedicated certification procedure.

On the paving site: under the quality-control procedure of the Ministry of Construction and Housing, transport is in clean metal truck bodies covered with tarpaulin, and unloading into the paver may not stop for more than 15 minutes, to prevent the mix from cooling. Hence the importance of an asphalt plant close to the site – browse by region above, and see also the asphalt paving price guide .

Sources: Ministry of Construction and Housing (gov.il) – quality-control procedure for laying asphalt layers (in Hebrew) · Netivei Israel (iroads.co.il) – certification procedure for asphalt mix producers 51.04.301, edition 5, April 2024 (in Hebrew) . Processed and summarised by Israel Concrete.

🚚 Looking for suitable transport?
🟡 Tipper – bulk asphalt transport on Movil Israel (in Hebrew) →
❓ Frequently asked questions
What is the difference between hot and cold asphalt?
Hot asphalt is produced and transported at high temperature and must be laid quickly, a short time after production. Cold asphalt is used mainly for spot repairs and can be used at ambient temperature, but is less durable in the long term.
How long does asphalt take to set and become usable?
After rolling, the asphalt surface is usually walkable within a few hours, but it is best to avoid heavy loads (vehicles) for 24–48 hours, according to the manufacturer's instructions.
Can I pave a private driveway with asphalt?
Yes, this is a common use. Check with the supplier that the mix suits private-car loads (not necessarily the same mix used for main roads).
What is the maximum distance between the asphalt plant and the paving site?
Hot asphalt has to reach the site and be laid before it cools, so it is best to work with a plant close to the site.
Which standard is asphalt produced to in Israel?
The main standards are SI 362 for hot asphalt mixes, SI 161 Part 1 for bitumen and SI 1865 for test methods. The requirements that apply to a given job are set in the job specification and by mix type. Plant production control is assessed under Process Standard 20, and supplier approval for a specific client's works follows that client's approval procedure.
Who approves asphalt plants for road works?
The Standards Institution of Israel approves plants under Process Standard 20, and Netivei Israel certifies asphalt mix producers for its works under a dedicated certification procedure.
⚠️ Disclaimer

Israel Concrete is a guide and directory based on independent research and information gathering and on industry experience. The data is presented for information and orientation only and does not constitute a recommendation or official approval. Verify all details directly with the suppliers before any engagement. Use of this platform is at the user's sole responsibility. Full legal disclaimer (in Hebrew) → Glossary of professional terms →

✉️ Contact
Spotted an error, outdated details or content that needs correcting or removal? Contact us and we will handle it within 48 hours.