A new OECD report, Measuring Connectivity across the India-Middle East-Europe Corridor (2026)[1], is the first systematic review of infrastructure along the India–Middle East–Europe Economic Corridor (IMEC). It finds that rail connectivity is the corridor’s weakest component and that Jordan is the critical gap: there is currently no continuous rail link between Israel, Jordan, Saudi Arabia and the UAE. On the Israeli side, the report notes that Haifa port is connected to the rail network and that the Jezreel Valley line to Beit She’an is due to be double-tracked.
For the building-materials sector this is a long-term opportunity, not a near-term construction project. Some of the infrastructure is statutorily approved, but for most of it we found no verified budget or timetable. This article separates what exists, what has been approved and what is still a vision.
What is IMEC?
IMEC was announced on 9 September 2023 at the G20 summit in New Delhi, in a memorandum of understanding signed by India, Saudi Arabia, the UAE, France, Germany, Italy, the United States and the European Union[9]. The memorandum describes two corridors: an eastern corridor linking India to the Gulf by sea, and a northern corridor linking the Gulf to Europe. The northern corridor would run by rail through Saudi Arabia and Jordan to Israel, then by sea from Mediterranean ports to Europe. Alongside transport, the memorandum also mentions electricity and data cables and a pipeline for clean hydrogen.
Israel and Jordan are not signatories, but the memorandum names them as part of the route, and the OECD describes them as indispensable to it[1]. The memorandum itself states that it does not create rights or obligations under international law[9]. According to the OECD, a steering committee and working groups have operated since 2025, and regional events since 7 October have turned the corridor from a single route into a “network of corridors”[1].
What did the OECD find about infrastructure in the region?
The report’s infrastructure chapter covers ports, rail, roads and logistics performance[2]. These are the main findings for Israel.
Ports. Haifa and Ashdod have a combined capacity of 5.7 million TEU a year, and Israel has about 2.6 million TEU of immediately available spare capacity. Israel Ports Company told the OECD that the two ports currently run at around half of their capacity. Even so, the report warns that if transit volumes rise substantially, Israeli ports could become a bottleneck[1].
Rail. According to the report, Israel’s rail network is modern but runs mainly north–south along the coast. Lines reaching inland, such as the line to Beit She’an, do not continue into Jordan. Haifa port has been connected to the rail network since 2025[1].
Jordan. Jordan’s railway uses a 1,050 mm gauge, which is incompatible with the 1,435 mm standard gauge used in Israel and Saudi Arabia. According to the report, none of the projects announced so far addresses a cross-border rail connection on Jordan’s side of the border – the most significant missing link in the chain[1].
Roads and crossings. Until rail continuity is achieved, inland freight in the region will rely on roads. The report notes that Highways 71, 75 and 90, which link the ports to the Jordanian border, are mostly two-lane roads and may need widening and upgrading if freight flows grow. Israel–Jordan crossings require back-to-back transshipment (moving cargo from truck to truck), and according to the report, delays at crossings are a bigger obstacle than the quality of the infrastructure itself[1].
Beit She’an and the Jordan River crossing – the Israeli link
Beit She’an is where Israel’s railway currently ends to the east. Nearby is the Jordan River crossing (Sheikh Hussein Bridge), the northernmost crossing between Israel and Jordan. According to the OECD, about 300,000 tonnes of cargo passed through it in 2016, almost twice as much as the Allenby Bridge, the second-largest crossing[1].
The railway: what is approved
National infrastructure plan TTL 13/A/1, the “Jordan River Railway”, sets the planning framework for a passenger and freight line from Beit She’an station to the Jordan River crossing. The plan includes a passenger station, a freight loading and unloading station, a border crossing for passengers and cargo, a tunnel between Nahal Dushan and Nahal Yissachar, grade separations from Highways 71 and 90, bridges over streams, and the realignment of a section of Highway 90[3]. The plan was approved in June 2022 and published in the official gazette in September 2022[4].
What is not verified
Statutory approval is not a budget. In March 2022 the project was estimated to cost about NIS 3.2 billion and had not been funded by the Ministry of Finance[5]. We found no recent official source for funding, a tender or a construction timetable. In April 2026 Israel Railways said that statutory planning from Beit She’an to the Jordan River had been approved and that the Jezreel Valley line was expected to be double-tracked, but again no construction dates were published[7].
The crossing today
The Jordan River crossing is already a key route for goods between Israel, Jordan and the Gulf, but its capacity is limited. According to Manufacturers’ Association figures published in September 2026, it handles about 100–150 trucks a day, compared with 230–250 until September 2024, and the Israel Airports Authority decided to extend its opening hours[6]. The OECD notes that improvements to the crossing have been approved on the Israeli side and are expected to reduce crossing times within five to six years[1].
Transit point or logistics hub?
If Beit She’an serves only as a transit point, most of the economic value will pass through it: trains and trucks cross the border, and local activity is limited to inspection and clearance. An intermodal freight terminal, where cargo is transferred between rail and road and where there is storage and distribution space, creates lasting activity in the area: buildings, platforms, paved yards and access roads, and later jobs and maintenance. The approved plan includes a freight loading station, but we found no approved plan for a dry port or a large-scale logistics hub at Beit She’an.
The Jezreel Valley railway and the link to Haifa ports
The Jezreel Valley railway opened to passengers in October 2016 and runs about 60 km from Haifa to Beit She’an[10]. The OECD describes it as single-track. Under the Connecting Israel programme, which adds around 300 km of new lines, it is due to be double-tracked, creating in the report’s words a high-capacity, uninterrupted rail connection from the border to the port of Haifa. According to the report, the programme as a whole is expected to be completed by 2035[1]. We found no separate timetable for double-tracking the Jezreel Valley line.
On the port side, the OECD notes that Haifa port has been connected to the national rail network since 2025[1]. A continuous line from the border to the port still does not mean that any given cargo would be routed to Haifa. The choice between Haifa and Ashdod, and between rail and road, depends on tariffs, shipping services and arrangements that have not yet been made.
Two limitations are worth keeping in mind. A single track limits the number of trains, especially when it also carries passengers. And a freight terminal at Beit She’an would depend on the Jordanian side, where, as noted, there is currently no suitable railway.
What infrastructure is missing?
The table includes only data for which we found a source. “Not verified” means we found no official source, not that the information does not exist.
| Infrastructure | Location | Current state | Status | Verified budget | Verified timetable | Source |
|---|---|---|---|---|---|---|
| Jezreel Valley railway | Haifa–Beit She’an | Operating since 2016, single track | Existing and operating | — | — | [1][10] |
| Haifa port rail connection | Haifa | Operating since 2025 | Existing and operating | — | — | [1] |
| Jordan River crossing (road freight) | Near Beit She’an | About 100–150 trucks a day (September 2026) | Existing; upgrades approved on the Israeli side | Not verified | Five to six years for upgrades (per OECD) | [1][6] |
| Double-tracking the Jezreel Valley line | Haifa–Beit She’an | Single track | In preparation – Connecting Israel programme | Not verified | Whole programme by 2035 (per OECD) | [1][7] |
| Jordan River Railway – TTL 13/A/1 | Beit She’an–Sheikh Hussein Bridge | Plan in force since 2022 | Statutorily approved | Not verified; estimated at NIS 3.2 billion (2022), unfunded at the time | Not verified | [3][4][5] |
| Railway in Jordan from the Israeli border | Jordan | No suitable railway; 1,050 mm gauge | Vision only – no announced project | — | — | [1] |
| Mines–Aqaba railway | Southern Jordan | Agreement in April 2026, foundation stone in October 2026; does not connect to Israel | Early construction | USD 2.3 billion (per OECD) | Not verified | [1][8] |
| Widening of Highways 71, 75 and 90 | North and Jordan Valley | Mostly two-lane | Possibility only (per OECD) | — | — | [1] |
On mobile, scroll the table sideways.
- Haifa port Connected to the rail network
- Jezreel Valley railway – operating, single track (double-tracking in preparation)
- Beit She’an End of the existing line
- Jordan River Railway – statutorily approved, not built
- Jordan River crossing / Sheikh Hussein Bridge Operating truck crossing
- No railway in Jordan towards Israel – rail gap
- Jordan Different track gauge
- No rail continuity
- Saudi Arabia and the UAE Existing networks, not yet connected
Schematic only – not to scale and not an alignment. It does not show an approved route.
What it means for concrete, quarries and asphalt
This is where the findings end and our analysis begins. There are no detailed construction plans today from which quantities of concrete or aggregates could be derived, so we do not present quantitative estimates. What we can say is which materials each component would require:
- Ready-mix concrete – bridges, a tunnel, station and terminal buildings, border-crossing and operations buildings. Tunnel and bridge work usually requires high-strength concrete and tight quality control.
- Aggregates and quarry materials – sub-base for the track bed and roads, earthworks, and track ballast: crushed stone in a dedicated grading on which the sleepers rest.
- Asphalt plants (in Hebrew) – access roads to the terminal, the Highway 90 realignment in the plan and, if it goes ahead, road widening in the area. See the asphalt plant map.
- Precast concrete products (in Hebrew) – bridge beams, drainage channels and culverts, retaining walls and technical buildings.
- Cement (in Hebrew) – the base material of the entire concrete supply chain.
- Reinforcing steel – bridges, the tunnel and concrete structures.
Most of the planned works are concentrated in the Beit She’an Valley. Quarries, ready-mix concrete plants and asphalt plants operate in northern Israel; see the quarry map and the asphalt plant map.
In the short term the direct impact is likely to be limited: without a budget and a tender there is no new demand for materials. The things to watch are Israel Railways’ budget decisions and tenders in the valley.
Barriers, budgets and timetables
- Agreements between countries. The original route runs through Saudi Arabia and Jordan, and Jordan is not a signatory to the memorandum. A rail link requires a decision and funding on the Jordanian side[1][9].
- Infrastructure limits in Jordan. An incompatible gauge, and no announced project to connect with Israel. According to the Jordanian government, its national railway plan is expected to be completed by 2030, but the OECD notes that delays remain possible, and the plan does not include a direct link to Israel[1]. In October 2026 the foundation stone was laid for a railway between Jordan’s mines and Aqaba, in partnership with the UAE[8].
- Rail continuity. Saudi Arabia and the UAE are not yet connected by rail either, and according to the OECD geopolitical tensions may delay the GCC Railway[1].
- Security and stability. The report describes how the war, restrictions in the Strait of Hormuz and attacks in the Bab al-Mandab have shifted trade patterns and caused congestion at border crossings[1].
- Costs. The short Israeli section alone, from Beit She’an to the border, was estimated in 2022 at about NIS 3.2 billion and had not been funded[5].
- Viability against shipping. The report does not conclude that the corridor is cheaper than the sea route. It notes that to be a real alternative to routes such as the Suez Canal, countries will need to resolve delays at crossings[1].
- Competing corridors. According to the report, the “Peace Railway” from the Gulf to Israel through Jordan has not gained sufficient political traction, and there are competing initiatives that bypass Israel, such as the revival of the Hejaz Railway promoted by Türkiye[1].
Summary – a significant infrastructure opportunity, but not yet a finished project
The OECD presents IMEC as a real opportunity, but makes clear that the inland network in the Middle East is far from continuous. On the Israeli side most links exist or are statutorily approved: Haifa port is connected to rail, the Jezreel Valley line operates, and the Jordan River Railway plan is in force. What is missing is a budget, a timetable and, above all, a rail continuation on the Jordanian side.
For the building-materials sector this is a development worth following, but not a basis for planning demand in the coming years.
Questions and answers
Is Israel a signatory to the IMEC memorandum?
No. The 2023 memorandum was signed by India, Saudi Arabia, the UAE, France, Germany, Italy, the United States and the European Union. Israel and Jordan are named in it as part of the route.
Is there a railway from Israel to Jordan today?
No. Israel’s railway reaches Beit She’an. The line to the border is statutorily approved but not built, and there is no suitable railway on the Jordanian side.
What is the status of the Jordan River Railway?
Plan TTL 13/A/1 was approved in 2022. We found no official source for a budget, a tender or a construction timetable.
Will the corridor increase demand for concrete and aggregates?
In the long term, if the projects are funded and built, they will require concrete, aggregates, asphalt, precast products and steel. In the short term there is no new demand without a budget and tenders.